POWERED BY SOLVEMPIRE

ROBOCHAIN

Premium 1-Year Advanced Robotics & Innovation Mentorship

Students don't just learn technology — they build it. A premium personalized engineering journey designed for the next generation of creators, builders, and STEM competitors.

1 YearDuration
96 SessionsInteractive Classes
1:1 LiveFocus Model
Quarterly KitsHardware Delivery
2 OfflineWorkshops
100% PracticalCurriculum Basis
THE PHILOSOPHY

THIS IS NOT A
CLASSROOM COURSE.

At ROBOCHAIN, we reject standard passive lectures. We deliver a fully custom, structured 1:1 premium mentorship model where students learn through continuous physical hardware construction.

Students build actual, practical electronics and mechanical devices, master C++ logic inside the Arduino IDE, prototype functional components in Fusion 360, explore machine learning, and flight dynamics.

No prior coding or engineering base is required. We start from absolute ground zero and elevate students into certified innovators.

C++ CODING
ARDUINO
SENSORS
3D CAD
SUMO BOT
DRONES
VISION AI
CIRCUITS
INNOVATE
BENEFITS

WHY THE PROGRAM SURPASSES ALL STANDARD STEM COURSES

01

Premium 1:1 Mentorship

Each student is paired with a dedicated personal tech mentor to learn coding, assembly, and physics at their own pace.

02

Quarterly Hardware Kits

No virtual simulators. Students receive real, premium microcontrollers, sensors, and chassis directly at home every 3 months.

03

Fusion 360 & 3D Printing

Learn mechanical CAD design to build custom parts, followed by real practical 3D printing slicing and engineering workshops.

04

Drone Mechanics & Aviation

Understand lift, drag, telemetry, and flight control boards through hands-on flying and physical calibration sessions.

05

Competitive Robotics Training

Prepare to win. Get trained to optimize code and chassis design for National Sumo, Line Following, and Soccer Bot challenges.

06

AI & Autonomous Systems

Introduction to Artificial Intelligence, training computer vision concepts, object detection, and autonomous vehicle logic.

PROGRAM DETAILS

DETAILED PROGRAM SPECIFICATIONS

Mentorship Program1-Year Advanced Robotics & Innovation
Sessions96 Classes (Live & Physical Workshops)
Class FormatFlexible Weekend Batches (Sat & Sun)
Session Length1 to 1.5 Hours per session
Kits Shipped4 Premium Custom Kits (Included)
Expert Focus AreasElectronics, Coding (C++), Fusion 360, AI & Drones
Workshop AccessDedicated Offline Modules for Printing & Flying
Official AwardCertified Junior Robotics Innovator
STUDY STRUCTURE

SYLLABUS & PROGRESSIVE TIMELINE

Explore our intensive 7 academic modules and 2 offline specializations.

Module 1 SPECIFICATION

Robotics & Electronics Foundations

Introduction & Circuit Fundamentals

THEORY CORE

  • ▸Robotics classification and real-world system applications
  • ▸Theory of Current, Voltage, Resistance & Ohm's Law
  • ▸Series & Parallel circuits, reading schematics
  • ▸Breadboard layout mechanics and debugging electronic loops

PRACTICAL LABS & BUILDS

  • Constructing manual physical LED circuits
  • Designing magnetic buzzer switch alarm networks
  • Assembling transistor-driven smart switch gates
PORTFOLIO

CORE PROJECTS STUDENTS WILL CONSTRUCT

01
Bluetooth Controlled RobotRobotics & Wireless
02
Autonomous Line FollowerAutomation & Code
03
Maze Solving RobotAlgorithmic Logic
04
RC Soccer BotCompetitive Design
05
Heavyweight Sumo BotHigh Torque Systems
06
Smart Plant Irrigation NetworkIoT & Agriculture
07
Water Conservation Rain AlarmEnvironmental Tech
08
Human-Following Companion BotSensor Integration
09
Bespoke CAD Prototype ProjectFusion 360 Innovation
HARDWARE INCLUDED

FOUR CUSTOM KITS DELIVERED QUARTERLY

To align with progressive complexity, hardware components are divided into four specific custom modules and shipped directly to the student's home.

Every sensor, microcontroller unit, wheel array, and wireless controller listed is premium-grade and strictly physical.

100% Physical MaterialsTested and structured for domestic experimentation safety
Arduino UNO Board
Active DC Gear Motors (High Torque)
High-Precision Servo Motor
Industrial Stepper Motor
Dual-Layer Acrylic Robot Chassis
L298N High-Voltage Motor Driver
Ultrasonic Sonar Distance Sensor
Triple IR Line Detection Sensors
Analog LDR Ambient Light Sensor
Bluetooth Serial Wireless Module
Smart Liquid Soil Moisture Sensor
Solderless Premium Breadboard
Interconnecting Jumper Wire Set
High-Decibel Audio Buzzer
Multi-Color High-Luminosity LEDs
Standard Resistance Kit (Ohm Pack)
Modular Battery Cell Enclosure
Interlocking Tech Wheels & Ball Caster
INVESTMENT

ANNUAL PROGRAM ENROLLMENT INVESTMENT

ANNUAL FEE BREAKDOWN

WHAT THE PROGRAM SPECIFICALLY SECURES:

  • ✓96 Live Interactive Classes (1:1 personalized focus)
  • ✓4 Premium Custom Robotics Hardware Kits delivered home
  • ✓Fusion 360 professional modeling & mechanical design training
  • ✓Autonomous system programming & artificial intelligence basics
  • ✓Calibration access to physical 3D printers and Drone arrays
  • ✓Complete curation of student portfolios for engineering admissions
  • ✓Active personal doubt support and competition trial guidance

*Note: Third-party competition registration fees, specific student travel packages, and replacement of self-damaged microcontrollers are not included.

TOTAL PROGRAM VALUE
₹1,75,000₹1,50,000inclusive of all custom quarterly hardware
Mentorship & Code Training₹1,00,000
Hardware Components₹50,000
SECURE MENTOR SLOT
RECOGNITION

CERTIFIED JUNIOR ROBOTICS INNOVATOR

Issued exclusively to students who successfully pass all 96 structural sessions, complete their primary autonomous vehicle layout, and deliver their customized Fusion 360 portfolio.

OFFICIAL ISSUER: ROBOCHAINPOWERED BY SOLVEMPIRE
ENROLLMENT DESK

BUILD THE
FUTURE TODAY.

Slots for active, premium 1:1 mentorship are limited annually. Reserve your physical component package and secure coordination schedules.

APPLY FOR ADMISSION SLOT